EXPLORINEER
en

US — TechCrunch

After the midterms, a bigger clash over data centers could be coming

Policy1 min read

Voters in several U.S. states pushed back against new data centers in the November midterm elections. This could lead to a bigger political fight over where these AI facilities are built.

Voters push back on data centers

In the November 3 midterm elections, Democrats gained full control of Congress. Many voters also showed anger about data centers, the large buildings full of computers that power AI. Candidates who spoke against fast data center building won seats in several states. Now, Democrats in Congress may try to put new limits on data centers.

Key numbers from the vote

  • An NBC exit poll (a survey of voters as they leave the polling place) found that more than half of people think AI will do more harm than good.
  • Almost 80% of respondents said they oppose data centers being built in their neighborhoods.
  • Almost 60% said data centers were a crucial or major factor in their vote.
  • OpenAI has looked at a $500 billion data center in Ohio, backed by more than $100 billion in financing from Nvidia.

Why people are worried

Data centers use a lot of electricity, and many use gas turbines (machines that burn gas to make power). People living near these sites worry about pollution and higher power bills. Supporters say the buildings are needed for national security and to keep up with China in the race to lead in AI.

Why this matters

The fight over data centers is no longer only about tech companies. It is now a voting issue that can shape laws about energy, land, and the environment. Local communities may gain more say over where these large facilities are built and who pays for the power they need.

What to watch

  • Whether more towns and states pass building pauses, called moratoriums.
  • Whether data centers must pay for their own power grid upgrades instead of passing the cost to neighbors.
  • Whether Congress passes bills like the one from Sen. Bernie Sanders and Rep. Alexandria Ocasio-Cortez, which would pause new data centers nationwide. A president could veto (reject) such a bill.

Glossary

data center
A large building full of computers that store data and run AI and internet services.
exit poll
A survey of voters asked right after they vote, used to learn why people chose as they did.

Same story, different eyes

Ad

Add 150 words. Learn 10 a day.

Dicter word books send only the words you learn to your review notes.

PolicyTechCrunch

AI PACs spent millions trying to shape Congress — here’s how they fared

AI-focused political groups on both sides spent millions trying to influence the midterm elections and the future of AI regulation, with mixed results. Industry-backed American Mission and Building the Future spent $4.8 million backing South Carolina Senate candidate Darline Graham, who lost, while pro-safeguard groups such as Public First and Guardrails Alliance also saw both wins and losses.

PolicyITmedia

Democrats Take Both Houses in US Midterms, Raising Odds of Tougher AI Rules as Big Tech Shares Rise

Democrats won majorities in both the U.S. House and Senate in the November 3 midterm elections, ending Republican control of the White House and Congress. Democrats are expected to use congressional investigative powers to increase scrutiny of AI companies, with AI data center construction and Big Tech oversight in focus. Meanwhile, Amazon, Meta, Alphabet and Microsoft shares rose on the market after the results, though President Trump retains veto power over federal legislation.

PolicyZDNet Korea

KEPCO Wins Preliminary Zero-Energy Building Grade 1 Certification for Major Office Building, a First in Korea

Korea Electric Power Corporation (KEPCO) said its new Gangwon Division headquarters building, in Chuncheon, has received preliminary Zero Energy Building (ZEB) Grade 1 certification, the first for a domestic office building of 15,000 square meters or more. Originally certified at Grade 3, the building was upgraded by applying various energy technologies, and it is targeting completion in 2029. KEPCO plans to apply ZEB Grade 1 to its other new buildings, including the Gyeongbuk Division office.

PolicyThe Verge

17 better ways Elon Musk could have wasted $446 million

The Verge's Elizabeth Lopatto argues that Elon Musk's roughly $446 million in midterm election spending was wasteful, pointing to $47 million from his America PAC that targeted Texas Democrat James Talarico, who won with 55 percent of the vote over Musk's preferred candidate, Ken Paxton. She blames X's echo chamber for misjudging public sentiment, including anger toward data centers and the tech industry. The column then lists alternative purchases, such as a private island, luxury cars, and the Washington Post, that Musk could have bought instead.