EXPLORINEER
en

KR — 전자신문

Democrats Win Big in US Midterms, Raising Concerns Over AI Data Center Construction

Policy1 min read

Democrats won big in the U.S. midterm elections, and this could slow down new AI data center projects. Several newly elected Democratic governors want to stop or limit data center construction in their states.

What happened

Democratic candidates won governor races in key states, including Texas, Ohio, and Georgia. Many of them had promised to stop new data center projects or to add stricter rules. Bloomberg reports that up to half of planned new U.S. AI data center expansion could be affected by these tougher rules.

Key numbers and facts

  • Texas is the biggest case. Its new governor, Gina Hinojosa, is the first Democrat to win the job in about 30 years.
  • She promised to fully stop approving new data centers during her campaign.
  • About 30% of U.S. data center capacity planned to start in 2028 is in Texas, according to the research firm SemiAnalysis.
  • GLJ Research says about 13 gigawatts (GW) of data center plans in Texas could be directly hit.
  • Projects that have power but lack environmental permits could be delayed by 12 to 18 months.

Why data centers are a fight

AI data centers are huge buildings full of computer chips that need a lot of electricity and water to run and stay cool. Local people worry that they push up power bills and use up water. That is why some politicians want to limit them.

Why it matters

Stricter rules could make data centers cost more and take longer to build. This could affect demand for Nvidia's AI chips, memory chips, and cooling equipment. However, experts say most projects will not stop completely. Instead, they may face higher costs and more paperwork, so the build-out of AI computing may slow down.

What to watch

  • Whether Texas's new governor actually makes the promised ban on new data center approvals.
  • Whether Ohio's governor sets clear conditions for restarting construction.
  • Whether companies move projects to other states or cancel early-stage plans.
  • How much data center construction costs rise and how long permits take.

Glossary

AI data center
A large building full of powerful computers that run AI services.
Nvidia
A U.S. company that makes AI chips used in data centers.
SemiAnalysis
A market research firm that tracks chips and data center growth.

Ad

Add 150 words. Learn 10 a day.

Dicter word books send only the words you learn to your review notes.

PolicyTechCrunch

AI PACs spent millions trying to shape Congress — here’s how they fared

AI-focused political groups on both sides spent millions trying to influence the midterm elections and the future of AI regulation, with mixed results. Industry-backed American Mission and Building the Future spent $4.8 million backing South Carolina Senate candidate Darline Graham, who lost, while pro-safeguard groups such as Public First and Guardrails Alliance also saw both wins and losses.

PolicyITmedia

Democrats Take Both Houses in US Midterms, Raising Odds of Tougher AI Rules as Big Tech Shares Rise

Democrats won majorities in both the U.S. House and Senate in the November 3 midterm elections, ending Republican control of the White House and Congress. Democrats are expected to use congressional investigative powers to increase scrutiny of AI companies, with AI data center construction and Big Tech oversight in focus. Meanwhile, Amazon, Meta, Alphabet and Microsoft shares rose on the market after the results, though President Trump retains veto power over federal legislation.

PolicyZDNet Korea

KEPCO Wins Preliminary Zero-Energy Building Grade 1 Certification for Major Office Building, a First in Korea

Korea Electric Power Corporation (KEPCO) said its new Gangwon Division headquarters building, in Chuncheon, has received preliminary Zero Energy Building (ZEB) Grade 1 certification, the first for a domestic office building of 15,000 square meters or more. Originally certified at Grade 3, the building was upgraded by applying various energy technologies, and it is targeting completion in 2029. KEPCO plans to apply ZEB Grade 1 to its other new buildings, including the Gyeongbuk Division office.

PolicyThe Verge

17 better ways Elon Musk could have wasted $446 million

The Verge's Elizabeth Lopatto argues that Elon Musk's roughly $446 million in midterm election spending was wasteful, pointing to $47 million from his America PAC that targeted Texas Democrat James Talarico, who won with 55 percent of the vote over Musk's preferred candidate, Ken Paxton. She blames X's echo chamber for misjudging public sentiment, including anger toward data centers and the tech industry. The column then lists alternative purchases, such as a private island, luxury cars, and the Washington Post, that Musk could have bought instead.